Spoiled parts, record of, for cost department 136
Spoiled work, fixing responsibility for 23
Staff or functional organization 4
Standard committee for approving limits 145
STANDARDIZING TESTING 305
PAGE
Standardizing details in locomotive plant 296
Standards, for purchased materials 239
importance of establishing 16
Stands, tool, for use with machine tools 202
Stock and equipment, value of surplus 114
Stock department card index 117
Stock-keeper, qualifications of 51
Stock -keeping system 46
Stock numbers 47
Stock record for incoming and outgoing material 50
Stock requisition and parts list 49
Stock-room, location and arrangement 47
Stock-tracing system 220
Storage and maintenance of small tools 146
Storage fixtures, for tools 151
general arrangement 151
unit system of construction 153
Storage of blueprints 150
Storage of clamps, bolts, and packing blocks 150
Storage of large jigs and fixtures 149
Storage of tools, location of bins, drawers, or racks 147
on basis of usefulness 148
summary of common systems 166
supervision of 147
Storage vault for drawings 285
Store-rooms, classes of tools and supplies kept in 148
Subject index for purchasing department 242
Supplies and small tools, ordering 251
Supply and tool system for large plant 56
Supply order or requisition for purchasing 239
Supply room arranged according to tool classification 197
Surplus stock and equipment, value of 114
Symbol number of parts, tools filed under 95
Symbols and part numbers 33
Symbols, tool, based on class of work 189
Symbol which indicates location of tool 198
Systematized management 6
Systems to facilitate shop management 18
Tabor Mfg. Co.'s planning department 9
Tabor Mfg. Co.'s standard tool racks 153
Tabor Mfg. Co.'s tool supply system 192
Tap and die storage racks 158
Tapping, set of tools for 182
Taylor differential wage system 264
Taylor system of tool classification 193
Telephone system for manufacturing plant 53
Testing purchased materials in laboratory 79
306 TIME TRACING
PAGE
Time and motion study 7
Time estimate and route card 120
Time records 42
Time schedule for work 120
Tool and operation lists for shop foremen 188
Tool and supply system for large plant 56
Tool breakage, determining causes of 166
Tool cabinets constructed on unit plan 153
Tool checking systems 169
Tool designing department, organization of 209
Tool designing, points to be considered 210
Tool drawings, filing system for 214
materials for 212
Tool engineering department 205
Tool engineer's qualifications 205
Tool engineer's work, order of 207
Tool grinder, location of 163
Tool grinding in storage or supply room 160
Tool lists stamped on jigs and fixtures 184
Toolmaking labor cost, record of 91
Toolmaking work, system of assigning 85
Tool numbers, card file of tools arranged according to 95
Tools and supplies, classes kept in store-rooms 148
ordering small 251
Tools, broken or worn, replacement of 72
in sets, delivery of 178
in sets, heavy, stored on skids 184
in sets, portable cabinets for 182
lathe and planer, identified by numbers 191
located in supply room according to classification 197
maintenance of, on systematic basis 164
rack for storing turning and planing 164
sets of, kept by workmen 186
special, identification of 187
storage and maintenance of 146
Taylor system of classification 193
Tool sets in special boxes 179
Tool-stands for use with machine tools 202
Tool supply room, check boards 175
location and plan of 146
with tools located according to classification 197
Tool supply systems, in general use, summary of 166
under scientific management 192
Tool symbols, based on class of work 189
which indicate tool location 198
Towne-Halsey premium system 260
Tracer card for showing progress of work 117
Tracing system for stock 220
TRANSFER WORN-OUT 307
PAGE
Transfer of tools, for repair, record of .................................. 99
from stock-room to tool rooms ...................................... 67
permanent to another supply room .................................. 105
Unit system of storage rack construction .............................. 153
Vault, storage, for drawings ......................................... 285
systems for manufacturing plants .............................. 258
Worn or broken tools, replacement of .................................. 72
Worn-out tools, discarding ............................................ 102
414893
Lit
Tl
UNIVERSITY OF CALIFORNIA LIBRARY