Boston Redevelopment Authority.

Neighborhood housing and development project directory. (draft) online

. (page 1 of 3)
Online LibraryBoston Redevelopment AuthorityNeighborhood housing and development project directory. (draft) → online text (page 1 of 3)
Font size
QR-code for this ebook


BOSTON PUBLIC LIBRARY



3 9999 06583 014 1





J&


^^^


rlLVxt-iJ


^^SSn


^


^^m


L II


^^^^


m


Mm




i^'^^


3


?/)^


Hi lii


%vf.,,



BOSTON
PUBLIC
LlBl^RY




^-/. ^f



' Ub /




BOSTON REDEVELOPMENT AUTHORITY



NEIGHBORHOOD
HOUSING & DEVELOPMENT



PROJECT
DIRECTORY



MARCH 1989 DRAFT



BOSTON

PUBLIC

LIBRARY




MOTECa 1

i N,^ j



NEIGHBORHOOD HOUSING AND DEVELOPMENT
PROJECT DIRECTORY

TABLE OF CONTENTS



I. SOUTH END DISPOSITION HOUSING

Coordinated by Tom O'Malley, Director for South End Planning and
Development. Disposition housing developments in the South End
neighborhood. Includes South End dispostion developments
pre-dating the South End Neighborhood Housing Initiative (SENHI),
SENHI Fast Track and Phase I developments, and the Parcel to
Parcel 2/Helen Morton Center project.

Pro.lect Name : Prelect Manager ;

1134 Washington Street * John Noone

1154 Washington Street * Bob McGilvray

255-293 Northampton St. /Parcel RC-7. * Maria Faria

406-408 Harrison Avenue * Bob McGilvray

45 Thorndike Street * Maria Faria

47 Thorndike Street * Maria Faria

611 Tremont Street * Maria Faria

Parcel to Parcel 2/Helen Morton Center * Antonio Torres

TDC 111/395,397,400 Massachusetts Ave. * Maria Faria

Tent City Phase II * John Noone

SENHI PHASE I * Tom O'Malley

75 East Berkeley Street/TDC IV * Bob McGilvray

Allen House/1682 Washington Street * Tom O'Malley

Porter House/ 1724- 1726 Washington St. * Tom O'Malley

Lodging Housg/1734- 1740 Washington St. * John Noone

Roxbury Corners/Parcel 29A, 1777-89 Wash.* Maria Faria

640 Tremont Street/IBA * Tom O'Malley

6-14 East Concord Street/Old Boston * Maria Faria

Langham Court * John Noone

Parmalee Court * Laura Burns



II



NEIGHBORHOOD DISPOSITION HOUSING (NON-SOUTH END)



Coordinated by Ron Fong, Deputy Director for Affordable Housing
Production. Disposition housing developments in Boston's
neighborhoods not including the South End, the Waterfront (Harbor
Planning Department), and Downtown (Urban Design and Development
Department). Includes dispostion developments in the following
neighborhoods: Charlestown, Chinatown/South Cove, East Boston,
Hyde Park, Jamaica Plain, Roslindale, and Roxbury .



Pro.iect Name ;
CHARLESTOWN



Prelect Manager :



Charlestown Parcel P-2A
Charlestown Parcel R-87
Charlestown Parcel R-87A
Charlestown Parcel R-96
Charlestown Parcel R-107



Laura Burns (HP)
Laura Burns (HP)
Laura Burns (HP)
(Bob Rush, HP)
(Bob Rush, HP)



CHINATOWN/SOUTH COVE



Waterford Place/180 Shawmut Avenue *

Chinatown Parcel A *

Chinatown Parcel B , *

Don Bosco (South Cove P-12) ' *

South Cove Parcels P-12B I *

South Cove Parcels P-3, P-3A 1 CHIP II *

South Cove Parcels P4, 4A, 4B I *

South Cove Parcel R-1 I *



(Aaron Schleifer, NPZ)

Ron Fong

Ron Fong

Ron Fong

Ron Fong

Ron Fong

Ron Fong

Ron Fong



EAST BOSTON



East Boston Parcels EB-23, 24



* Laura Burns



HYDE PARK



Parcel SWC-4
Parcel SWC-6



* Phil Zeigler

* Phil Zeigler



JAMAICA PLAIN



113-117 Lamartine St-
Mission Hill NHS



Ron Fong
John Noone



ROSLINDALE



Parcel SWC-1
Parcel SWC-2
Parcel SWC-3



* Phil Zeigler

* John Noone

* Phil Zeigler



II. NEIGHBORHOOD DISPOSITION HOUSING (NON-SOUTH END) (cont.)
Project Name ; Project Manager :

ROXBURY DISPOSITION HOUSING



14-20 Linwood Street

32 Dale Street

63 Highland Street

Bartlett Court

C.A.B.

Conkling/Garrison-Trotter Phase I

Douglass Plaza Phase I

Douglass Plaza Phase II

Fountain Hill Phase I

Fountain Hill Phases II&III

Garrison-Trotter Phase II

Infill Housing

Marcella Street Townhouses

St. James Estates

Washington Park Parcel J5-B

Washington Park Parcels F3a, 3b

Winslow Court Phase I

Winslow Court Phase II



Wendy Lucas
Laura Burns
Bob McGilvray
Antonio Torres
Wendy Lucas
Laura Burns
Laura Burns
Laura Burns
Laura Burns
Laura Burns
Laura Burns
Tom O'Malley
Maria Faria
Wendy Lucas
Laura Burns
Ron Fong
Ron Fong
Ron Fong



III. ECONOMIC DEVELOPMENT/DISPOSITION DEVELOPMENT

Coordinated by Owen Donnelly, Deputy Director for Neighborhood
Economic Development. Includes commercial, institutional,
mixed-use and other non-housing developments on BRA disposition
parcels. The Parcel to Parcel 1 Project (Kingston/Bedford -
Parcel 18) is not descibed in this section. For a description of
this key economic development project see Special Project
section .



185 State Street

19 Clarendon/Boston Ballet/BCA

22-26 Warren Street

237 Harrison Avenue

411 Harrison Avenue/Adams Transmission

421-435 Harrison Avenue/Parcel SE-120

851 Albany/Parcel X-40/Gold Key

95 Dudley Street

Campus High Parcel R-14

Campus High Parcel P-3/NCAAA

Massachusetts Square

New Roxbury Post Office/Parcel P-2C

Parcel EB A-2/Cunard Lot

Parcel SWC-5

Roxbury Heritage State Park

SMILE Preschool/Parcel H-bb

Stride Rite/Parcels 41-D,E

Washington Park Parcel F-6 (Grove Hall)



John Noone
Bob McGilvray
Bob McGilvray
(Aaron Schleiffer,
Bob McGilvray
Bob McGilvray
Bob McGilvray
Bob McGilvray
Deniz Ozan
Phil Zeigler
Maria Faria
Owen Donnelly
Antonio Torres
Phil Zeigler
Joan Smith
Laura Burns
Maria Faria
Dave Baker



NPZ)



Digitized by the Internet Archive

in 2010 with funding from

Boston Public Library



http://www.archive.org/details/neighborhoodhousdOOmbost



IV,



CAPITAL IMPROVEMENT PROJECTS



Coordinated by David Baker under the guidance of Owen Donnelly,
Deputy Director for Neighborhood Economic Development. Includes
active Capital Improvement project in which NHD staff members are
involved, focusing on the South Cove/Chinatown, South End and
Roxbury neihborhoods .



Pro.ject Name :
CHINATOWN/SOUTH COVE



Project Manager



Chinatown Gateway
SOUTH END



* David Baker



Contract J-2 /Montgomery & Pembroke

Contract E-2/Dartmouth Place

Contract G-2/Tent City

Tent C ity /Yarmouth Place-Loop Road

West Canton Street

Monsignor Lally Park

Hayes Park

Worcester Square Park

Shawmut Avenue Phase I



Maria Faria
Maria Faria
John Noone
John Noone
Maria Faria
Maria Faria
Maria Faria
Maria Faria
Maria Faria



ROXBURY



Fountain Hill Square Phase I
New Dudley Street Phase II
John Eliot Square
Parcel P-3/NCAAA
Cedar Square Park
Garrison Trotter Way
Douglass Plaza



David Baker
David Baker
David Baker
Phil Zeigler
Deniz Ozan
Laura Burns
Laura Burns



V. BOARD OF APPEALS HOUSING (NON-DISPOSITION)

NHD is responsible for managing non-disposition housing
developments of 20 units and more through the Zoning Board of
Appeals and Design Review processes. An important component is
negotiating the voluntary inclusion of affordable housing units
or contributions to nearby affordable housing developments.
Antonio Torres is responsible for the majority of these pro,]ecti
In this section "AHA" is frequently used as an abbreviation for
"Affordable Housing Agreement."

Project Name ; Project Manager :

JAMAICA PLAIN

336 Adams Street, South Dorchester * Antonio Torres

200 Allandale Road, Jamaica Plain * Antonio Torres

Allandale Glen, Jamaica Plain * (Nancy Tentindo, UDD)

Baker Square, South Dorchester * Antonio Torres

55 Bay Street, Dorchester * Antonio Torres

56-65 Brookside Avenue, Jamaica Plain * Antonio Torres

Chestnut Park Condos, West Roxbury * Antonio Torres

Clarendon Court, Hyde Park * Antonio Torres

Clif f mont /Grew, Roslindale * Antonio Torres

Clippership Wharf, East Boston * (Pam Wessling, UDD)

21-35 Coleman Street, Dorchester * Jon Layzer

Deacon Court, South End * Antonio Torres

540 East Broadway Street, South Boston * Antonio Torres

73-79 Essex St., South Cove/Chinatown * Ron Pong

Fabreeka Mills, South Dorchester * Antonio Torres

The Foundry, South Boston * Antonio Torres

86-106 Fulton Street, North End * (Peter Dreier)

Gumball Factory/Orleans, East Boston * Antonio Torres

Hancock Woods, West Roxbury * Antonio Torres

9-11 Harcourt Street, Back Bay/Fenway * Antonio Torres

High Point Village, Roslindale * Antonio Torres

Lotus Street, Jamaica Plain * Antonio Torres

108 Kilmarnock Street, Back Bay/Fenway * Antonio Torres

Newfield Woods, West Roxbury * Antonio Torres

15 North Beacon/Union Square, Brighton * Antonio Torres

North Beacon/St. Joseph's, Brighton * Antonio Torres

125-138 Tudor Street, South Boston * Antonio Torres

30-40 Weld Street, Roslindale * Antonio Torres



VI



SPECIAL PROJECTS



A wide variety of ongoing, planning and research, special
disposition and development projects related to affordable
housing and neighborhood economic development, and major NHD
management initiatives. Includes the departments major planning
initiatives and projects which require a greater depth of
description. Parcel to Parcel Project 1 is described in this
section .



Project Name :

MAJOR PLANNING INITIATIVES

CHINATOWN MASTERPLAN

Chinatown Housing Improvement Program

ROXBURY PLANNING

PARCEL TO PARCEL PROJECT 1

One Lincoln Street (Kingston/Bedford)
Ruggles Center (Parcel 18)

SOUTHWEST CORRIDOR PLANNING

Parcels 9 & 10
Parcels SR-14, P-3A

NCAAA PLANNING

Campus High Parcel P-3

Other NCAAA planned developments

DUDLEY BUSINESS DISTRICT

ROXBURY IPOD

SOUTH END MASTERPLAN

South End Parking Study
South End Open Space
South End Community Land Trust
SENHI Phase II

LEASED PROPERTIES



Project Manager :

* (Ting Foo Yeh, UDD )

* Ron Fong

* Owen Donnelly

* Anthony Williams

* (Pam Wessling, UDD)

* Anthony Williams

* Owen Donnelly

* Owen Donnelly

* Owen Donnelly

* Phil Zeigler

* Phil Zeigler

* Phil Zeigler

* Owen Donnelly

* Muhammad Ali-Saiaam

* Tom O'Malley

* Tom O'Malley

* Tom O'Malley

* Deniz Ozan

* Tom O'Malley



Church/Good Shepherd

Church/United Community/ 1 16 Roxbury

Whittier Street Health Center

DISPOSITION SPECIAL PROJECTS

557 Tremont Street/St. Cloud

57 East Concord Street

157 West Springfield Street



* Phil Zeigler

* Bob McGilvray

* Phil Zeigler

* Bob McGilvray

* Bob McGilvray

* Bob McGilvray

* Maria Faria



VI. SPECIAL PROJECTS (cont.)



Project Name ;

PUBLIC SUBSIDY BRIEFING/PIPELINE

Low-income Housing Tax Credits

SHARP

Section 8

Chapter 707

Chapter 705

MIFA

RHDAL

HIF

HOP



Pro.iect Manager

* Ron Feng

* Laura Burns

* Laura Burns

* Wendy Lucas

* Wendy Lucas

* Deniz Ozan

* Wendy Lucas

* John Noone

* John Noone

* Deniz Ozan



GENERAL REHABILITATION

Women for Comm . Service/55S Mass. Ave
Charlestown Working Theatere Rehab.
Hale House Rehabilitation

BUSINESS RELOCATION

NHD ENGINEERING AND DESIGN

OTHER SPECIAL PROJECTS



* Bob McGilvray

* Bob McGilvray

* Bob McGivray

* Jon Layzer

* Major Lewis

* Mirdza Zeipe



Westminster-Willard/Mandela Apartments
Dudley Street Neighborhood Initiative

MANAGEMENT AND ADMINISTRATION



* Tom O'Malley

* Andrea D'Amato



OFFICE MANAGEMENT
Board Process
Central Files
Time Management
NHD Hiring Process
Secretarial Services



MANAGEMENT INFORMATION SYSTEMS
NHD Computer Systems
Agenda Project Directory

COMMUNITY PROCESS

South End Community Process

NHD Community Process



* Jeannie Lynn

* Jeannie Lynn

* Jeannie Lynn

* Jeannie Lynn

* Jeannie Lynn

* Marta DeJesus

* Delores Rice

* Margaret Owens

* Jon Layzer

* Jon Layzer

* Jon Layzer

* Laval Wilson

* Mark Johnston

* Josephine Thompson



CRITICAL RESPONSE UNIT

SMALL PROJECTS/SPECIAL ASSISTANT



* Jon Layzer

* Laval Wilson



I. SOUTH END DISPOSITION HOUSING



- *SOUTH END DISPOSITION HOUSING-



Coordinated by Toi O'Malley, Director for South End Planning and
Developient. Disposition housing developients in the South End
neighborhood include dispostion developients pre-dating the South End
Neighborhood Housing Initiative (SENHI), SENHI Fast Track and Phase I
developients, and the Parcel to Parcel 2/Helen Morton Center project.



* Briefing Itea ♦
.Project Manager
.History
.Overview



.Status/ Issues



-1134 Washington Street

John Noone

Construction coaplete, Certificate of Cospletion 12/88
Hub Realty (Harry the Greek) and ATSE rehabilitation of
building: 7 affordable coop units artists live/work
space on top two floors; bottoe two floors retail.
AMend LDA in Spring '89 to allow for return of half
the consideration paid for the land ($62,500) to ATSE,
facilitating the final sale of the upper two floors.



♦ Briefing Iten ♦
.Project Manager
.History
.Overview



.Status/Issues



-1154 Washington Street -—

Bob McGilvray

Groundbreaking 6/87

Boston Citv Lights rehabilitation of six story brick

building: 8 iarket rate rental units will support the

rehabilitation which includes affordable practice space

for the perforiing arts group.

Under Construction



■* Briefing Iten *
.Project Manager
.History
.Overview



.Milestones
.Milestones
.Milestones
.Status/ Issues



-255-293 Northaipton Street/Parcel 8C-7

Maria Faria

Tentative Designation 9/87

Urban Design Teai, developer. Incorporates privately

owned abutting land. Total developient proposal is 18

units including 6 affordable units (2/3 affordability)

on BRA land.

Final Designation Est. 5/89

Groundbreaking Est. 5/89

Certificate of Coipletion Est. 1991

Progress depends on resolution of litigation involving

privately owned abutting land.



* Briefing Itei •
.Project Manager
.History
.History
.Overview



.Status/ Issues



-406-408 Harrison Avenue

Bob McGilvray

Final Designation 12/87

Groundbreaking 9/88

Rehabilitation of building by Mr. Hong, South End

displaceient victii in 1970's. Building is 4 units

including 1 affordable unit

Under Construction



♦ Briefing Itei * 45 Thorndike Street -

.Project Manager ♦ Haria Faria

.History ♦ Final Designation 4/88

.Overview ♦ Cardinal Rehab., Inc. rehabilitation of 3 unit

building; all 3 units will be affordable.
.Status/ Issues ♦ Under construction



* Briefing Itei * 47 Thorndike Street

.Project Manager * Maria Faria
.Overview ♦ 3 unit building

.Status/ Issues » Originally designated to Tent City diplaceient victia
(Mr. Cook), interest withdrawn; need to re-advertise.



-* Briefing Itei *
.Project Manager
.History
.History



-611 Treiont Street -
Maria Faria
Final Designation 2/fl
Conveyed 2/89



Page I



I. SOUTH END DISPOSITION HOUSING



.Overview ♦ Rehabilitation of 4 unit building to include 1

affordable unit by Angel Medina
.Milestones ♦ Groundbreaking Est. 5/89
.Milestones ♦ Certificate of Coipletion Est. 5/89
.Status/ Issues * Financing issues



■* Briefing Itei ♦
.Project Manager
.History
.Overview



.Overview



.Overview



.Milestones
.Milestones
.Milestones
.Status/ Issues



-—Parcel to Parcel 2/Helen Morton Center

* Antonio Torres

♦ Tentative Designation 4/88

♦ Originally introduced as the 'Tree of Life," because of
the Transitional Housing prograa; the project is a
linkage developient, bringing gap financing and
Binority and woaen business equity participation froB
the Part Square site to be developed by Pavillion
Corporation.

* The South Park Partnership's current developient
proposal includes a total of 100 units of wnich 36
units are transitional housing (for hoaeless woBen and
their children) and 24 units are affordable to loderate
incoae households.

♦ Developient also includes a daycare center, to be
developed on an adjoining site, which serves faiilies
in the Helen Morton Center transitional housing
prograi.

• Final Designation Est. Fall '89

* Groundbreaking Est. Fall '89

♦ Certificate of Coipletion Est. Spring '91

* Seeking fin financial coiiittients and subsidies for
affordable housing units.



■♦ Briefing Itea ♦
.Project Manager
.History
.Overview



.Status/Issues
.Milestones



-TDC 111/395,397,400 Massachusetts Avenue

Maria Faria

Final Designation 12/85

Total developient is 59 units of which 38 units

(two-thirds) will be affordable to low- and

ioderate-incoie households.

Construction coipleted on two building rehabs

(395,397); constuction underway on vacant parcel (400)

Certificate of Coipletion Est. Suiier '89



-♦ Briefing Itei *
.Project Manager
.Overview



.Milestones
.Milestones
.Milestones



-Tent City Phase II

John Noone

Project to redevelop two buildings on Yariouth and

Coluabus which were originally supposed to be rehabbed,

but had to be torn down after construction of Tent

City.

Asiendaents ot Air Rights Lease Est. Spring '89

Groundbreaking Est. 4/89

Certificate of Coipletion Est. 3/90



♦ Briefing Itei *
.Project Manager
.History
.History
.Overview



.Overview



.Milestones
.Status/ Issues



- 75 East Berkeley Street/TDC IV

* Bob McGilvray

* Final Designation 7/88

* Groundbreaking 1/89

* Seven brick townhouses will be renovated by the Tenants
Developient Corporation to yield 35 units of which 24
will be affordable to low- and aoderate-incoie
households.

* Disposition was initiated as t.he SENHI 'Fast Track" to
expedite the rehabilitation of these historically
significant buildings.

* Certificate of Coipletion Est. 9/89
» Under construction



-* Briefing Itea » Allen House/1682 Washington Street

.Project Manager ♦ Toa O'Malley

.History ♦ This historic aansion was tentatively designated 10/87
in the first round of SENHI.



Page 2



I. SOUTH ESD DISPOSITION HOUSING



.History ♦ Developer designation rescinded (Rennaissance

Properties).
.Milestones » To be re-advertised in Spring '89.
.Status/ Issues * Hay require RFP for eiergency repairs and funding.
.Status/ Issues ♦ Redeveloptent costs are estiiated to be high enough to

lake a financing gap inevitable even if the project

becomes 100 percent larket rate.



» Briefing Iteu ♦
.Project Manager
.Overview



.Milestones
.Status/Issues



-Porter Hou3e/1724-1726 Washington Street

Toi O'Malley

Believed to be the oldest existing building in the

South End, this building was tentatively designated

10/87 in the first round of SENHI.

Need to re-advertise

Developer designation rescinded (Rennaissance

Properties).



•• Briefing Itea *
.Project Manager
.History
.Overview



. Milestones
.Milestones
.Milestones
.Milestones
.Milestones
.Status/Issues



- -Lodging House/1734-1740 Washington Street

* John Noone

* Fast Track Final Designation 12/88

* Vacant five story building to be rehabilitated by 1734
Washington Street Liaited Partnership/Paul Sullivan
Housing Trust into 32 affordable Single Rooa Occupancy
(SRO) units

* Scheiatic Design approval Est. 3/89

* Board of Appeal Referral Est. 3/89

* Working Drawings Est. 6/89

* Groundbreaking Est. 6/89

* Certificate o£ Coipletion Est. 1/90

* Seeking SHARP approval



■* Briefing Itei *
.Project Manager
.History

.Overview



.Overview



.Milestones
.Milestones
.Milestones
.Milestones
.Status/Issues



- -Roxbury Corners/Parcel 29A and 1777-1789 Washington —

♦ Maria Faria

♦ Tentative Designation of sites separately: Parcel 29A -
10/87, 1777-1789 Washington - 12/88.

♦ The vacant parcel - 29A - was tentatively designated in
the first round of SENHI; 1777-1789 Washington is a row
of buildings across the street for which developer
designation was recently rescinded.

♦ Total developient by United South End/Lower Roxbury
Developient Corporation (UDC) is 47 units of which 32
units will be affordable to low- and Boderate-incoae
households.

♦ Board of Appeal Referral Est, 5/89

♦ Final Designation Est. 9/89
' Groundbreaking Est. 1/90

♦ Certificate of Coipletion Est. 6/92

♦ Seeking SHARP approval



* Briefing Itei *-
.Project Manager
.History
.Overview



.Milestones
.Milestones
.Milestones
.Milestones



-640 Treiont Street/IBA

Toi O'Malley

Tentative Designation 10/87

Inquilinos Boricuas en Accion (ISA) will rebuild the

kburned-out Shawiut Congregation Church to yield 27

hoie ownership units of which 18 units will be

affordable to low- and loderate-incoae households.

Board of Appeal Referral Est. 3/89

Final Designation Est. 6/89

Groundbreaking Est. 7/89

Certificate of Conpletion Est. 7/90



-* Briefing Itea * 6-14 East Concord Street/Old Boston - -

.Project Manager ♦ Maria Faria
.History • Tentative Designation 10/87
.History ♦ Board of Appeal Referral 11/88
.History ' Zoning Approved 1/89

.Overview ♦ Developaent by Old Boston Restorations incorporates the
abutting MacDonald Wharehouse, renovated by Old Boston



Page 3



I. SOUTH END DISPOSITION HOUSING



in 1965, to bring 40 new units of rental housing on
line of which 12 units (30X) will be affordable.
Final Designation Est. 3/89
Groundbreaking Est. 4/89
Certificate of Coipletion Est. 7/89



.Milestones
.Milestones
.Milestones



♦ Briefing Itei *

.Project Manager

.History

.History

.History

.Overview



.Overview

•Milestones
.Milestones
.Milestones



-Langhai Court

John Noone

Tentative Designation 10/87

Board of Appeal Referral 10/88

Zoning Approved 11/88

The Four Corners Developaent Corporation, a non-profit

foried by residents of the surrounding neighborhood,

will develop this site into 84 units of iixed incone

housing including a 55 unit (50 affordable)

cooperative.

A total of 56 units (two-thirds) will be affordable

cooperative or condoainiui units.

Final Designation Est. 3/89

Groundbreaking Est. 5/89

Certificate of Cospletion Est. 12/91



•♦ Briefing Itei *
.Project Manager
.History
.Overview



.Milestones
.Milestones
.Milestones
.Milestones



-Parialee Court

Laura Burns

Tentative Designation 10/87

York Bay Development Corporation will develop this site

into 74 new units of housing of which 49 units

(two-thirds) will be affordable to low- and

■oderate-incoie households.

Board of Appeal Referral Est. 3/89

Final Designation Est. 6/89

Groundbreaking Est. 6/89

Certificate of Cotpletion Est. 3/91



Page 4



II. NEIGHBORHOOD DISPOSITION HOUSING (NON-SOUTH END)



- *NEIGHB08H0OD DISPOSITION HOUSING (NON-SOUTH END)-



Coordinated by Ron Fong, Deputy Director for Affordable Housing
Production. Disposition housing developients in Boston's neighborhoods
not including the South End, the Waterfront (Harbor Planning Departient),
and Dornitoirn (Urban Design and Developient Departient). Includes
dispostion developianta in the following neighborhoods: Charlestown,
Chinatown/South Cove, East Boston, Hyde Park, Jasaica Plain, Roslindale,
and Roxbury.



- CHARLESTOWN DISPONSITION HOUSING-



■♦ Briefing Itei *
.Project Manager
.History
.Overview



.Milestones
.Milestones
.Milestones
.Status/ Issues



- -Charlestown Parcel P-2A - - -

* Laura Burns

* Tentative Designation 6/9/88

* Gate Five Associates designated to develop 28 units, of
which 14 units (SOX) will be affordable, on the vacant
site.

* Board of Appeal Referral Est. 4/89

* Final Designation Est. 4/89

* Certificate of Conpletion Est. 6/90

» Gap financing as part of CNY/149 Housing Creation
Proposal to be subaitted in Spring '89.



•♦ Briefing Itei ♦ Charlestown Parcel R-87

.Project Manager * Laura Burns

.History * Authorization to advertise RFP 9/29/88

.History ♦ RFP Advertised 11/21/88

.History * Proposals due 1/23/89

.Milestones * Tentative Designation Est. 3/89

.Milestones ♦ Board of Appeal Referral Est. 4/89

.Milestones ♦ Final Designation Est. 4/89

.Milestones ♦ Certificate of Coipletion 12/89

.Status/ Issues ♦ Proposals under review.

.Status/Issues * EDC Proposal taps into linkage/housing creation:

possible part of CNY/149 Charlestown set-aside.
.Overview * Parcel regaining after authorization to convey R-87A to

BHA for Section 689 housing.



♦ Briefing Itei * Charlestown Parcel R-87A -

.Project Manager ♦ Laura Burns

.History * Authorized to convey to BHA 6/9/88

.Milestones * Board of Appeal Referral Est. 5/89

.Milestones ♦ Groundbreaking Est. 6/89

.Milestones » Certificate or Coipletion Est. 12/89

.Status/Issues ♦ Awaiting building penit application by BHA.

.Overview ♦ Parcel to be convevd to the Boston Housing Authority to
be developed into 5 units of Chapter 689 (special
needs) housing in conjunction with EOCD and the
Departient of Mental Health.



♦ Briefing Itei * Charlestown Parcel R-96

.Project Manager * (Bob Rush)
.Status/ Issues * Final Designation

.Overview * 12 units, all affordable, to be developed by 136-142
High Street Trust.



♦ Briefing Itei ♦ Charlestown Parcel R-107

.Project Manager * (Bob Rush)
.Status/ Issues * Tentative Designation


1 3

Online LibraryBoston Redevelopment AuthorityNeighborhood housing and development project directory. (draft) → online text (page 1 of 3)