Iowa. Highway Commission.

Annual report online

. (page 28 of 35)
Online LibraryIowa. Highway CommissionAnnual report → online text (page 28 of 35)
Font size
QR-code for this ebook


4,538.30












41


$18,645.07


17


$15,518.97


V.


Engineering on Bridge and Culvert Repair and Construction
Salaries, transportation and supplies


1913
$ 650.75


1914
$ 1,515.22


Roads


t.




1
I.


County Road Fund.

Amount of balance


Jan. 1-13
$ 4,493.95


Nov. 1-13
$ 6,575.20




Amount of overdraft ,_. _






Amount paid in _


1913
19,323.75


1914
36,916.58




Outstanding warrants Nov. 1 ,_ _

Outstanding bills Nov. 1 __


i^oooloo




Amount of balance Nov. 1 _

Amount of overdraft Nov. 1_—

Estimated amount to be collected —


6,575.20

""i9u""""


13,429.70

""im

37.935.99


II.


Equipment and Material.

Road material on hand Nov. 1


1913


1914




Road machinery on hand Nov. 1


960.00


1,100.00


in.


Repair.

Amount spent on road repairs on County Road System
Culverts Classified as Road Work.

Total

Maintenance of County Road Svstem.

No. miles County Road System _

No. miles regularly dragged


23,845.72


IV.
V.


168

151

6

$ .50

1913


12,062.48

168
168




No. times dragged (average)




VI.
VII.
VIII.


Average cost per mile dragged, both sides

Permanent Work on County Road Svstem.
Permanent Work on Township Road System.
Engineering.

No. miles surveved


$ .60

1914

6.5




No. miles staked for grader repair








No. of miles profile platted


6.5




No. miles grade line approved by Highway Commission




3.5




No. miles officially approved by Highway Commls
Total Engineering Cost — Construction, etc.


sion.




3.5


IX.




$ 344.05


$ 743.24


















Digitized by


Gooq]



288
BHdse«.



FIRST ANNUAL REPORT OF THE
HENRY COUNTY.



II.
in.






Bridge Fund.

Balance on hand Jan

Overdraft Jan. 1

Amount collected to Nov. 1

Amount of balance Nov. 1

Overdraft Nov. 1

Outstanding bills Nov. 1

Outstanding warrants Nov. 1

Estimated bridge funds to be collected

Equipment and Material.

Bridge and culvert material on hand Nov. 1

Bridge and culvert equipment on hand Nov. 3

Rfpair.

Amount spent in repair wood bridges 1

Amount spent in repair steel bridges (wood floors) [

Amount spent in repair concrete bridges J



1W8
$ 1,596.67



27,879.43
6,889. SO



2,995.85

146.50

1914

28,000.00

1913

710.00

845.00



1914
9 1.011.17



29,528.20



5,290.34
100.00

6,099.25

1916
15,000.00

1914
800.00

^,140.00



4,963.62



IV.



New Construction.

Incased vitrified pipe -

Concrete box culverts

I-beam concrete abutments

Steel girders ~

Concrete slab _

Steel trusses, concrete floor and abutments

Circular concrete culverts

Sewer pipe culvert

Concrete deck girder

Miscellaneous bridge



1918



No.



Cost



( 3,158.45
4,919.08

806.60
2,306.60

438.70
2,458.80



97 $18,580.13



1914



No.



Cost



$ 6,013.13
13,856.67
5,180.34



I



8,804.80
1,158.19

16.25
1,747.92

12.80



165 $ 30,284.10



V.



Engineering on Bridge and Culvert Repair and Construction
Salaries, transportation and supplies



1918
930.00



1914



Roads.



II.

in.

IV.
V.



VT.

vn.

VIII.



IX.



County Road Fund.
Amount of balance _.
Amount of overdraft



Amount paid in ,

Outstanding warrants Nov. 1-

Outstanding bills Nov. 1

Amount of balance Nov. 1

Amount of overdraft Nov. 1_



Estimated amount to be collected

Equipment and Material.

Road material on hand Nov. 1 ._

Road machinery on hand Nov. 1

Repair.

Amount spent on road repairs on County Road System

Culverts Classified as Road Work.

Total —

Maintenance of County Road System.

No. miles County Road System

No. miles regularly dragged— —

Average number times dragged

Average cost per mile dragged, both sides

Permanent Work on County Road System.

Permanent Work on Township Road System.

Engineering.

No. miles surveyed _

No. miles staked for grader repair

No. miles profile platted

No. miles grade line approved by Highway Commission
No. miles officially approved by Highway Commission.

Total Engineering Cost— Road Construction, etc



Jan. 1-13



% 1,476.54
1913



546.18

"mi'""'



1913

""41525^02"

7,601.15

4,288.06

132.3
127.5
9
$ 1.04



1918



49



$ 591.67



Nov. 1-18
$ 546.18

1914
25,274.58



500.00
6,233.33



1915

25,500.00
1914



2,050.00

3,500.00

4,000.00

132.3
127.5
23.7



1914



44



8

1
545.80



Digitized by



Google



IOWA STATE HIGHWAY COMMISSION
HOWARD COUNTY.



28i»



Bridges.



I.


Bridffe Fund.

Balance on hand Jan. 1 1

Overdraft Jan. 1 - — ^....


1918
$ 8,762.56


1914
$ 18,611.69




Amount collected to Nov. 1

Amount of balance Nov. 1 —

Overdraft Nov. 1— __ ^


28,486.27
21,676.42


27,284.74
6,448.96




Outstanding bffla Nov. 1. -

Outstandlnir warrants Nov. 1-

Estimated bridge funds to be collected-


244.90

mi

28,000.00
1918
947.00
9S0.00

1,780.78


6,870.00

iSi'

28,641.00
1914
750.00


n.


Equipment and Material.

Bridge and culvert material on hand Nov. 1


in.


Bridge and culvert equipment on hand Nov. 1

Repair.

Amount spent in repair wood bridges

Amount spent In repair steel bridges (wood floors)

Amount spent In repair concrete bridges


1,180.00

644.00
812.01



IV.



New Construction.

Corrugated pipe culverts

Concrete box culverts

1 concrete thru girders

Concrete slabs

Circular concrete culverts

I-beams with concrete floor and abutments.

Wood pile bridges

Concrete slab bridges

Steel trusses with concrete floor and abut..



1918



No.



87



Cost



$ 821.87
6,162.88
1,650.00
8,250.00



$11,884.25



1914



No.



4

118

2



Cost



r 191.0C

26.181.66
8,160.00



5,069.09
2,995.00
1,410.00
9,199.00
12,121.00



187 < $ 60,266.75



V.



Engineering on Bridge and Culvert Repair and Construction
Salaries, transportation and supplies



1918
950.54



1914
$ 2,096.00



Roads.



I.



II.

in.

IV.
V.

VI.



VII.
VIII.



IX.



County Road Fund.
Amount of balance —
Amount of overdraft-



Amount paid In ;

Outstanding warrants Nov. 1

Outstanding bills Nov. 1

Amount of balance Nov. 1

Amount of overdraft Nov. l—



Estimated amount to be collected

Equipment and Material.

Road material on hand Nov. 1

Road machinery on hand Nov. 1

Repair.

Amount spent on road repairs on County Road System.

Culverts Classified as Road Work.

Total

Maintenance of County Road System.^

No. miles County Road System

No. miles regularly dragged

Average number times dragged—

Average cost per mile dragged, both sides

Permanent Work on County Road System.

Permanently graded, 1.25 miles, costing

To temporary grade with standard cross section (Class
II-B) 4.86 mlles.costing

Permanent Work on *l\)wnship Road System.

Engineering.

No. miles surveyed

No. miles staked for grader repair — _

No. miles profile platted

No. miles grade line approved by Highway Conunlsslon
No. miles officially approved by Highway Cbnmilssion.

Total Engineering Cost— Road Construction, etc



Jan. 1-13
$ 8,506.62



1913



8,800.77
"1914"""'



1918

""siiroo



2,596.96

122.8

50



$ .60

2,540.90



1918
11.5



8

7

2

460.60



Nov. 1-18
$ 8,800.77



1914
19,861.90



800.00
6,876.77



1915
21.095.81
1914



8,895.00
1,904.47



122.8
122.8
12
$ .75



5,159.92

1914

5

27

2

6

4

$ 1,005.00



19



Digitized by



Google



290
Bridsrea.



FIRST ANNUAL REPORT OP THE
HUMBOLDT COUNTY.



I.


Bridge Fund.

Balance on hand Jan. 1

Overdraft Jan. 1


1913
$ 597.97


1914
$ 2,362.75




Amount collected to Nov. 1 —

Amount of balance Nov. 1

Overdraft Nov. 1


24,503.07
2,405.74


20,840.68
14,627.59




Outstanding bills Nov. 1


300.00
16,718.44

1914
83.923.84
1913
1,150.00


6,000.00




Outstanding warrants Nov. 1

Estimated bridge funds to be collected


14,708.41
1916
34,182.91


II.


Equipment and Material.

Bridge and culvert material on band Nov. 1


1914
100.00




Bridge and culvert CQuipment on band Nov. 1




III.


Repair.

Amount spent in repair wood bridges -


2,272.04

1,804.55

40.00


800.00




Amount spent in repair steel bridges (wood floors)

Amount spent in repair concrete bridges-, —


1,000.00
310.00



IV.



New Construction.

Incased vitrified pipe

Concrete pipe culvert

Concrete box culverts

I-beam concrete abutments

Steel trusses, concrete floor and abutments.

High steel truss

Concrete slab

• Miscellaneous culverts



1918



No.



Cost



$ 100.00
77.91
4,068.61
6,939.87
4,820.81
18,854.75



856.22



27 $80,218.16





1914


No.


Cost







30

1
1


$ 8,971.17
1,145.00
2,235.00


1


1,003.25







88 $ 12,854.42



V.



Engineering on Bridge and Culvert Repair and Construction
Salaries, transportation and supplies —



1913
495.60



1914
$ 791.50



Roadii.



II.

m.

IV.
V.



VI.



vn.

VUT.



IX.



County Road Fund.

Amount of balance

. Amount of overdraft-



Amount paid in

Outstanding warrants Nov. 1

Outstanding bills Nov. 1

Amount of balance Nov. 1

Amount of overdraft Nov. 1



Estimated amount to be collected - —

Equipment and Material.

Road material on hand Nov. 1

Road machinery on hand Nov. 1

Repair.

Amount spent on road repairs on County Road System

Culverts Classified as Road Work.

Total _

Maintenance of County Road System.

No. miles County Road System. _

No. miles regularly dragged — *_ _

Average number of times dragged..-

Average cost per mile dragged, both sides

Permanent Work on County Road System.

Permanently graded 63 miles. costing

To permanent grade and standerd cross section (Class

II-A) 10.87 miles, costing. _

Tractor grader work (Class TT-C) 70.6 miles, costing-
Surfaced with 12' gravel. 1.25 miles, costing

Permanent Work on Township Road System.

Tractor grader work (Class II-C) 16 miles, costing—.

Engineering.

No. miles surveyed

No. miles staked for grader repair

No. miles profile platted

No. miles grade line approved by Highway Commission
No. miles officially approved by Highway Commission.

Total Engineering Cost— Road Construction, etc..



Jan. H8
$12,795.28



1913



20,377.92
■"1914"""



1913

"1^945^00"

391.23

280.41

129
129
11

$ .77

$ 3,173.66



1913
15



15
11.5



Nov. 1-18
$ 20,877.92



1914
48,202.57

"iiloooloo

12,835.12



1915

26,509.00
1914



1,685.00



129

129

15

$ .75



20.468.50

8,963.25

777.58

4,718.08
1914
28.25



28.26
23.25

4
$ 1.740.25



Digitized by



Google



IOWA STATE HIGHWAY COMMISSION
IDA COUNTY.



291



Briclsre*.



II.

m.



1-.



Bridge Fund.

Balance on hand Jan.

Overdraft Jan. i

Amount collected to Nov. 1

Amount of balance Nov. 1

Overdraft Nov. 1 •

Outstanding bills Nov. 1

Outstanding warrants Nov. 1

Estimated bridge funds to be callected.

Equipment and Material.

Bridge and culvert material on hand Nov. 1

Bridge and culvert equipment on hand Nov. 1

Repair.

Amount spent In repair of wood bridges

Amount spent in repair of steel bridges with wood floors
Amount spent In the repair of concrete bridges.



1918
$19,270.45



24,116.43
16.956.84



1914

84,966.94
1913
120.00
125.00

3,160.31



19U
$ 16,605.28



35,665.67
14,003.81



IMA

29,480.00
1914
2,488.40
615.00

9,960.08
299.20








1918


1914




No.


Cost


No. Cost


rv.


New Construction.

Concrete box culverts ,_


4
1

4
2

1


$ 1,492.75

12,031.00

3,121.68

3,638.86

1,274.53


41 $ 20,783.70




Concrete arch

Concrete slabs

Steel trusses, concrete floor and abutments..

I-Beam pile abutment

Corrugated pipe culverts


e 9,457.57
4 5,410.28




6,618.44










.


12


$21,558.82


51 $ 42,269.99



Engineering on Bridge and Culvert Repair and Construction
Salaries, transportation and supplies



1913
$ 768.50



1914
$ 932.21



Roadii.



II.

m.

IV.
V.

VI.



VIT.
VIII.



IX.



County Road Fund.
Amount of balance ..
Amount of overdraft



Amount paid in

Outstanding bills Nov. 1

Outstanding warrants Nov. L

Amount of balance Nov. 1

Amount of overdraft Nov. 1_.



Estimated amount to be collected .__

Equipment and Material.

Road material on hand Nov. 1 __

Road machinery on hand Nov. l-_

Repair.

Amount spent on road repairs on the county road system
Culverts Classified as Road Work.

Total - - -

Maintenance of County Road System.

No. miles county road system _

No. miles regularly dragged _

Average number of times dragged

Average cost per mile dragged both sides

Permanent Work on County Road System.

Permanently graded 1,400 ft. costing

Tractor grader work (Class II-C) 49 miles costing

Spent on permanent grading

Permanent Work on Township Road System.
Engineering.

No. of miles surveyed

No. of miles staked for grader repair

No. miles profile platted __ -

No. miles grade line approved by Highway Commission

No. miles officially approved by Highway Commission
Total Engineering Cost —



Jan. 1-13
$ 2,112.70



1913
8,526.13
400.00



5,989.56
""1914'""



1913
35o"oo"
698.34
7,956.82
132



$ 1,518.00



1913
8

$ m.&.



Nov. 1-13
$ 5,989.56



1914
20,950.18
8,004.83



7.190.46



1915

19,372.00
1914



1,875.00

1,584.24

15,703.38

132
123
22
; .75



2,415.73
2,204.81

1914

"49
6



$ 958.45



Digitized by



Google



292



FIRST ANNUAL REPORT OF THE



IOWA COUNTY.



Bridffe*



U.

m.



Bridge Fund.

Balance on hand Jan. 1

Overdraft Jan. 1 ___

Amount collected to Nov. 1 —

Amount of balance Nov. 1 _

Overdraft Nov. 1

Outstanding bills Nov. 1

Outstanding warrants Nov. 1 _ — —

Estimated bridge fimds to be collected

Equipment and Material.

Bridge and culvert material on hand Nov. 1

Bridge and culvert equipment on hand Nov. 1

Repair.

Amount spent in repair wood bridges _

Amount spent In repair steel bridges (wood floors).

Amount spent In repair concrete bridges



1913



$ 3,942.71
87,090.66



8,542.42
8,207.68
8,542.42

1914
46,722.00

1913
7,270.71



7,434.71
6.86



19^4
$ 1,337.82



46,682.02
13,876.73

~'i^589ri4
379.00
1915

49,600.00
1914
6,551.54



8,671.49
106.00
178.87







1918


1914




No.


Cost


No.


Cost


IV.


New Construction.

Concrete box culverts j

I-Beam concrete abutments


24
10
1
8
9


$ 9,852.64

7,897.10

859.64

6,837.41

10,480.98


49
14


$ 21,406.78
12,221.84




Concrete slab __






Steel trussesi concrete floor and abutments.

Miscellaneous bridges

Wood pile bridges









2


790.93




Corrugated pipe culverts —


1


9,007.82










65






47


$34,427.62


$ 48,426.87


V.


Engineering on Bridge and Culvert Repair and Construction.
Salaries, transportation and supplies


1918
$ 511.84


1914
$ 1,388.17













Roadii.



in.

IV.
V.

VI.



VII.
VTII.



County Road Fund.
Amount of balance __.
Amount of overdraft



Amount paid In

Outstanding warrants Nov. 1

Outstanding bills Nov. 1

Amount of. balance Nov. 1

Amount of overdraft Nov. 1



Estimated amount to be collected —

Equipment and Material.

Road material on hand Nov. 1

Road machinery on hand Nov. 1

Repair.

Amount spent on road repairs on County Road System

Culverts Classified as Road Work.

Total _

Maintenance of County Road System.

No. of miles county road system

No. miles regularly dragged ._

Average number timea dragged „

Average cost per mile dragged, both sides

Permanent Work on County Road System.

Permanently graded 42 miles costing

To permanent grade with standard cross section (Class
II-A) 9.46 miles costing

Permanent Work on Township Road System.

Engineering.

No. miles surveyed _

No. miles staked for grader repair

No. miles profile platted

No. miles grade line approved by Highway Commission
No. miles officially approved by Highway Commission

Total Engineering Cost— Road Construction, etc



Jan. 1-13
$ 6,043.23

1913""'"

11,003.10

286.54



2,693.01

""iou"""



1918

693"25'

1,856.98

6,804.26

171
155
11

$ .80

4,606.26



1913
43.5



28.6
4



$ 979.82



Nov. 1-13



I 38.76
1914

36,740.06

8,856.02

8,450.00

96.06



1916

80,600.00
1914



6,805.00

5,647.80

9,008.32

171
171
20
$ .80

24,922.50

1914

122



74
28



$ 2,329.07



Digitized by



Google



Bridflreti



IOWA STATE HIGHWAY COMMISSION
JACKSON COUNTY,



293



I.


Bridge Fund.

Balance on hand Jan. 1

Overdraft Jan. 1

Amount collected to Nov 1 _ _ — - - - —


1918


1914
$ 289.17

Siroirii




Amount of balance Nov. 1




2,258.96




Overdraft Nov. 1






n.


Outstanding bills Nov. 1 -

Outstanding warrants Nov. 1 — -

Estimated bridge funds to be collected

Equipment and Material.

Bridge and culvert material on hand Nov. 1

Bridge and culvert equipment on hand Nov. 1

Repair.

Amount spent in repair of wood bridges

Amount spent In repair of steel bridges with wood floors
Amount spent in repair of concrete bridges

New Construction.


1914
1918


16,000.00
13,962.96

Itflh
40,000.00

1914
800.00


in.


"" '




IV.






V.


Engineering on Bridge and Culvert Repair and Construction.
Salaries, transportation and supplies


1918 1 1914
$ 2.689.85



Roads.



II.



m.



IV.
V.



VI.



VII.
VIII.



IX.



County Road Fund.
Amount of balance _.
Amount of overdraft



Amount paid in

Outstanding warrants Nov. 1— .

Outstanding bills Nov. 1

Amount of balance Nov. 1

Amount of overdraft Nov. 1—



Estimated amount to be collected ,.-

Equipment and Material.

Road material on hand Nov. 1

Road machinery on hand Nov. 1

Repair.

Amount spent on repairs on county road system

Culverts Classified as Road Work.
Maintenance of County Road System.

No. of miles of county road system

No. of miles regularly dragged

Average number of times dragged

Average cost per mile dragged both sides

Permanent Work on County Road System.

Spent on permanent grading

Permanent Work on Township Road System.
Engineering.

No. of miles surveyed .

of miles staked for grader repair work

of jniles profile platted

of miles grade line approved by Highway Commls'n
of miles officially approved by Highway Commls'n
Engineering Cost



No.
No.
No.
No.
Total



Jan. 1-13
$ 2,894.93



1913
12,786.09



6,469.58

"mi""

"m¥"'



1913



Nov. 1-18
$ 6,469.58



1914
80,020.04

8,885.52

11.000.00

692.92

"Im""

29,000.00
1914

800.00
3,148.00

16,240.10



162



2,418.13
1914



$ 1.569.65



Digitized by



Google



294
Bridse*.



FIRST ANNUAL REPORT OF THE
JASPER COUNTY.



11.
m.



IV.



V.



Jan. 1.



Bridge Fund.

Balance on hand
Overdraft Jan. 1

Amount collected to Nov. 1

Amount of balance Nov. 1

Overdraft Nov. 1

Outstanding bllla Nov. 1

Outstanding warrants Nov. 1

Estimated bridge funds to be collected during

Equipment and Material.

Bridge and culvert material on hand Nov. 1

Bridge and culvert equipment on hand Nov. 1

Repair.

Amount spent In repair wood bridges

Amount spent in repair steel bridges (wood floors) .
Amount spent in repair concrete bridges—



1918
$28,914.80



41,247.94
22,577.60



1914
46,015.32
1918
2,588.00
722.00

1,195.78



1914
$ 2,S61.S



56,284.08
851.»



1,488.00



1915

82,200.00
1914
6,600.00
778.00

2,872.00

eooTii



New Construction.

Concrete box culverts .
Concrete deck girder ._.

Wood pile bridges

Concrete arch bridges .
Concrete slab bridges .

Boiler pipe

Retaining wall

Concrete slabs - .



1918



No.



Cost



$13,820.77

1,162.00

686.20

8,987.72

3,265.72



$22,772.41



1914



No.



55



Cost



$ 16,987.21



2,410.94

858.55

4,888.74



$ 24,095.44



Engineering on Bridge and Culvert Repair and Construction.
Salaries, transportation and supplies - -



1913
475.00



1914
1,910.00



Roads.



II.

III.
IV.
V.



VI.



VII.
VIII.



IX.



County Road Fund.
Amount of balance —
Amount of overdraft



Amount paid in

Outstanding warrants Nov. 1-.

Outstanding bills Nov. 1

Amount of balance Nov. 1 —
Amount of overdraft Nov. 1-.



Estimated amount to be collected

Equipment and Material.

Road material on hand Nov. 1 _

Road machinery on hand Nov. 1 _ _

Repair.

Amount spent on road repairs on County Road System
Culverts Classified as Road Work

Total ~ -

Maintenance of County Road System.

No. of miles county road system

No. of miles regularly dragged

Average number of times dragged _ —

Average cost per mile dragged, both sides

Permanent Work on County Road System.

Permanently graded 1.3 miles costing _

To permanent grade and standard cross section (Class

II-A) 4.5 miles costing __ —

Permanent Work on Township Road System.
Engineering.

No. of miles surveyed

No. of miles staked for grader repair ___

No. of miles profile platted— —

No. miles grade line approved by Highway Commission

No. miles officially approved by Highway Commission-
Total Engineering Cost— Road Construction, etc.



Jan. 1-13
$ 5,909.43



1913
23,211.89



16,523.50

mi'""



1913
6,990.90
5,536.80

1,852.04



204.8
204.8
12



11,185.65



1913
34

"15
6
2
$ 980.80



Nov. 1-18
$ 16,528.50



1914
46,908.04



12,788.01



1915

47,000.00
1914



4,986.00

4,509.35

12,724.00

204.8
204.8
20
$ .70

7,155.45

1914
22

'19
$ 2,125^00



Digitized by



Google



IOWA STATE HIGHWAY COMMISSION
JEFFERSON COUNTY.



295



BriifHTCn.



n.
m.



1—



Bridge Fund.

Balance on hand Jan.

Overdraft Jan. 1 ._

Amount collected to Nov. 1 —

Amount of balance Nov. 1

Overdraft Nov. 1

Outstanding bills Nov. 1

Outstanding warrants Nov. 1

Estimated bridge funds to be collected

Equipment and Material.
• Bridge and culvert material on hand Nov. 1

Bridge and culvert equipment on hand Nov. 1

Repair.

Amount spent In repair wood bridges

Amount spent in repair steel bridges, wood floors..

Amount spent in repair concrete bridges —



1913
$ 866.08



1914

32,l«6;e6

1918



400.00



8,319.02



1914



$ 6,067.95
83,290.33



5,449.73
5,752.80



1915

85,000.00
1914
1,968.74
497.00

1,061.24
8,306.15



1918



No.



Cost



1914



No.



Cost



IV.



New Construction.

Corrugated pipe culverts —

Concrete box culverts

Concrete pipe culverts

Circular concrete culvert

I-Beams on piling

I-Beam concrete abutments

Abutment

Wood pile bridges

Concrete slab



$ 875.18
4,817.96



172

ee

15

1

6
8

1
9
1



I 4,596.24
17,180.95
1,109.66
70.86
1,997.17
1,770.02
1,101.96
1,092.47
1,516.12



17



$ 4.723.11



275



$ 30,445.85



V.



Engineering on Bridge and Culvert Repair and Construction.
Salaries, transportation and supplies



1918
702.65 I $



1914
1,524.12



Roads.



I.


County Road Fund.

Amount of balance

Amount of overdraft

Amount paid in ^

Outstanding warrants Nov. 1

Outstanding bills Nov. 1

Amount of balance Nov. 1

Amount of overdraft Nov. 1


Jan. 1-13
$ 1,583.06

"'"iliS'oi'

4,982.46


Nov. 1-13
$ 4,962.46

8,081.85
980.06




Estimated amount to be collected


1914


1915
23,000.00


II.


Equipment and Material.

Road material on hand Nov. 1


1913
2,362.87
2,486.02


1914


III.


Road machinery on hand Nov. 1

Repair.

Amount spent on road repairs, on county road system. _


8,069.67
1,778.60


IV.


Culverts Classified as Road Work.

Total __ _




6,065.95


V.


Maintenance of County Road System.

No. miles county road system

No. miles regularly dragged _.

Average number times dragged


135.3


185.8
135.8
85




Average cost per mile dragged, both sides


$ .60


VI.

VII.
VTIC


Permanent Work on County Road System.

To temporary grade with standard cross section (Class

II-B) 12.5 miles costing

Tractor grader work (Qass II-C) 4.25 miles costing

Permanent Work on Township Road System.

Engineering.

No. miles surveyed _

No. miles staked for grader repair _


1913
52


8,108.37
438.45

1914

8.5
80




No. miles profile platted _ _

No. miles grade line approved by Highway Commission
No. miles officially approved by Highway Commission


12










IX.


Total Engineering Cost— Road Construction, etc


$ 688.15



Online LibraryIowa. Highway CommissionAnnual report → online text (page 28 of 35)